← All estimators
BOB estimators
Concrete Estimator
Slabs, thickened edges, stiffened rafts and strip footings Essentials · Pro
Full job pricing for slabs and footings — with suggested sizes adapted from the NCC 2025 Housing Provisions that you confirm, internal beams that lay themselves out on the drawing, and every finish.
Trades it prices
What you enter
- Site and design: the building, the site class from the soil report, the external walls, and whether footing sizes come from the NCC suggestion or your plans. Filled ground, a sloping site, or trees or abnormal moisture nearby are flagged as needing an engineer's design.
- Slabs — as many as you need — as a rectangle, L-shape, U-shape or bay, or Draw it; the thickness; and a grade from N20 to N32.
- The footing system: thickened edge, stiffened raft or strip footings, with widths, depth below the slab, trench mesh and layers, and the maximum beam spacing. A raft's internal beams lay themselves out on the drawing, and you can move or add them by hand.
- NCC suggested sizes: BOB suggests beam and footing sizes adapted from the NCC 2025 Housing Provisions (site classes A, S and M), and you confirm them. If your figures differ, BOB says so and yours stand.
- Mesh and membrane: mesh, re-entrant corner bars, a vapour barrier or damp-proofing membrane, and pipes through the film.
- The finish: trowelled, broomed, exposed aggregate, patterned or polished; coloured concrete, a sealer and curing compound.
- Edges and joints: formwork (the whole perimeter, less sides against walls, or typed), a brick rebate, suggested control joints and isolation joints against walls.
- Footings: pads and piers, optionally mixed from 20 kg bags.
- Pour and pump: waste, the number of pours (with the short-load fee on small pours) and the pump.
- Labour: place and finish per m², footings labour, or by the day.
- Excavation and prep: footing and beam excavation, spoil removal, compacted site prep, termite protection and a job allowance.
What BOB works out
- Concrete, mesh, membrane, finishing, excavation and labour, priced.
- The breakdown and the three PDFs.
Good to know
- BOB counts and prices what you enter; it doesn't design slabs or footings. Check sizes, mesh and beams against the engineer's drawings or the site classification (AS 2870).
- The National Construction Code 2025 was provided by the Australian Building Codes Board under the CC BY 4.0 licence. Figures adapted.
- Estimates are guides, built from the figures you enter. Check every estimate before you send it.
Rates, Draw it, Windows & doors, Home Warranty Insurance, PDFs and plans work the same in every estimator: How estimating works →
On Essentials and Pro
Pick the Concrete estimator as one of your three on Essentials, or get all 8 estimators on Pro.